A
|
Labour, machinery, fuel and lubricant for casting CONCRETE using one concrete mixture machine
|
1000
|
cft
|
Edit
|
|
A-1
|
Cost for placing 100 cft concrete using 1 mixer machine
|
1200
|
cft per day
|
Edit
|
|
A-2
|
Cost for placing 100 cft concrete using 1 mixer machine
|
1000
|
cft per day
|
Edit
|
|
A-3
|
Cost for placing 100 cft concrete using 1 mixer machine
|
800
|
cft per day
|
Edit
|
|
A-4
|
Cost for placing 100 cft concrete using 1 mixer machine
|
600
|
cft per day
|
Edit
|
|
A-5
|
Cost for placing 100 cft concrete using 1 mixer machine
|
500
|
cft per day
|
Edit
|
|
B-1
|
Concrete (1:3:6) work using BRICK CHIPS and sand of F.M. 1.2
|
100
|
cft
|
Edit
|
|
B-2
|
Concrete (1:2:4) work using BRICK CHIPS with sand of F.M. 1.2
|
100
|
cft
|
Edit
|
|
B-3
|
Concrete (1:2:4) work using BRICK CHIPS (sand of F.M. 1.2 and 2.2 in equal proportion)
|
100
|
cft
|
Edit
|
|
B-4
|
Concrete (1:2:4) work with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2
|
100
|
cft
|
Edit
|
|
B-5
|
Concrete (1:1.5:3) work with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2
|
100
|
cft
|
Edit
|
|
B-6
|
Concrete (1:1.25:2.5) work with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2
|
100
|
cft
|
Edit
|
|
B-7
|
Concrete (1:1:2) work with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2
|
100
|
cft
|
Edit
|
|
B-8
|
Fair-Face Concrete (1:1.5:3) work with CRUSHED STONE CHIPS, 75% grey cement, 25% white cement and 100% sand of F.M. 2.2
|
100
|
cft
|
Edit
|
|
B-9
|
Concrete (40 MPa) work with OPC (500kg/cum), CRUSHED STONE CHIPS and 100% sand of F.M. 2.2
|
100
|
cft
|
Edit
|
|
B-10
|
Concrete (25 MPa) work with PCC (400kg/cum), CRUSHED STONE CHIPS and 100% sand of F.M. 2.2
|
100
|
cft
|
Edit
|
|
B-11
|
Concrete (32 MPa) work with PCC (460kg/cum), CRUSHED STONE CHIPS and 100% sand of F.M. 2.2
|
100
|
cft
|
Edit
|
|
B-12
|
Concrete (1:1.25:2.5) work with PCC, CRUSHED STONE CHIPS and 100% sand of F.M. 2.2 for Saline Zone
|
100
|
cft
|
Edit
|
|
C-1
|
FOOTINGS OF COLUMN at plinth level using WOODEN shutter
|
24
|
sft
|
Edit
|
|
C-2
|
FOUNDATION BEAM using WOODEN shutter
|
75
|
sft
|
Edit
|
|
C-3
|
PADESTAL, COLUMN CAPITALS, LIFT WALLS and WALLS
|
40
|
sft
|
Edit
|
|
C-4
|
TIE-BEAM, LINTEL using WOODEN shutter
|
19.17
|
sft
|
Edit
|
|
C-5
|
T-BEAM, EL-BEAM, RECTANGULAR BEAM using WOODEN shutter
|
80
|
sft
|
Edit
|
|
C-6
|
FLOOR AND ROOF SLAB using WOODEN shutter
|
115
|
sft
|
Edit
|
|
C-7
|
CORNICE, DROP-WALLS, RAILINGS, LOUVER and FINS etc. using WOODEN shutter
|
62.5
|
sft
|
Edit
|
|
C-8
|
SUNSHADE using WOODEN shutter
|
34
|
sft
|
Edit
|
|
C-9
|
STAIR CASE SLAB and STEPS using WOODEN shutter
|
72.6
|
sft
|
Edit
|
|
C-10
|
FOOTINGS OF COLUMN at plinth level using STEEL shutter
|
40.63
|
sft
|
Edit
|
|
C-11
|
RAFT or MAT using STEEL shutter
|
12
|
sft
|
Edit
|
|
C-12
|
FOUNDATION BEAM using STEEL shutter
|
80
|
sft
|
Edit
|
|
C-13
|
PEDESTALS, COLUMN CAPITALS, LIFT WALLS and WALLS using STEEL shutter
|
40
|
sft
|
Edit
|
|
C-14
|
TIE-BEAM, LINTEL using STEEL shutter
|
18.75
|
sft
|
Edit
|
|
C-15
|
T-BEAM, L-BEAM, RECTANGULAR BEAM using STEEL shutter
|
80
|
sft
|
Edit
|
|
C-16
|
FLOOR AND ROOF slab using STEEL shutter
|
350
|
sft
|
Edit
|
|
C-17
|
CORNICE, DROP-WALLS, RAILING, LOUVER AND FINS etc.
|
62.5
|
sft
|
Edit
|
|
C-18
|
SUNSHADE using STEEL shutter
|
34
|
sft
|
Edit
|
|
C-19
|
STAIR CASE SLAB AND STEPS using STEEL shutter
|
70.5
|
sft
|
Edit
|
|
C-20
|
WAFFEL or RIBED SLAB using STEEL shutter
|
311.41
|
sqm
|
Edit
|
|
C-21
|
Arces, Domes, Vaults up to 8 m span
|
56.52
|
sqm
|
Edit
|
|
C-22
|
Formwork cost for making fair-faced concrete surface
|
40
|
sft
|
Edit
|