A Labour, machinery, fuel and lubricant for casting CONCRETE using one concrete mixture machine 1000 cft Edit
A-1 Cost for placing 100 cft concrete using 1 mixer machine 1200 cft per day Edit
A-2 Cost for placing 100 cft concrete using 1 mixer machine 1000 cft per day Edit
A-3 Cost for placing 100 cft concrete using 1 mixer machine 800 cft per day Edit
A-4 Cost for placing 100 cft concrete using 1 mixer machine 600 cft per day Edit
A-5 Cost for placing 100 cft concrete using 1 mixer machine 500 cft per day Edit
B-1 Concrete (1:3:6) work using BRICK CHIPS and sand of F.M. 1.2 100 cft Edit
B-2 Concrete (1:2:4) work using BRICK CHIPS with sand of F.M. 1.2 100 cft Edit
B-3 Concrete (1:2:4) work using BRICK CHIPS (sand of F.M. 1.2 and 2.2 in equal proportion) 100 cft Edit
B-4 Concrete (1:2:4) work with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2 100 cft Edit
B-5 Concrete (1:1.5:3) work with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2 100 cft Edit
B-6 Concrete (1:1.25:2.5) work with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2 100 cft Edit
B-7 Concrete (1:1:2) work with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2 100 cft Edit
B-8 Fair-Face Concrete (1:1.5:3) work with CRUSHED STONE CHIPS, 75% grey cement, 25% white cement and 100% sand of F.M. 2.2 100 cft Edit
B-9 Concrete (40 MPa) work with OPC (500kg/cum), CRUSHED STONE CHIPS and 100% sand of F.M. 2.2 100 cft Edit
B-10 Concrete (25 MPa) work with PCC (400kg/cum), CRUSHED STONE CHIPS and 100% sand of F.M. 2.2 100 cft Edit
B-11 Concrete (32 MPa) work with PCC (460kg/cum), CRUSHED STONE CHIPS and 100% sand of F.M. 2.2 100 cft Edit
B-12 Concrete (1:1.25:2.5) work with PCC, CRUSHED STONE CHIPS and 100% sand of F.M. 2.2 for Saline Zone 100 cft Edit
C-1 FOOTINGS OF COLUMN at plinth level using WOODEN shutter 24 sft Edit
C-2 FOUNDATION BEAM using WOODEN shutter 75 sft Edit
C-3 PADESTAL, COLUMN CAPITALS, LIFT WALLS and WALLS 40 sft Edit
C-4 TIE-BEAM, LINTEL using WOODEN shutter 19.17 sft Edit
C-5 T-BEAM, EL-BEAM, RECTANGULAR BEAM using WOODEN shutter 80 sft Edit
C-6 FLOOR AND ROOF SLAB using WOODEN shutter 115 sft Edit
C-7 CORNICE, DROP-WALLS, RAILINGS, LOUVER and FINS etc. using WOODEN shutter 62.5 sft Edit
C-8 SUNSHADE using WOODEN shutter 34 sft Edit
C-9 STAIR CASE SLAB and STEPS using WOODEN shutter 72.6 sft Edit
C-10 FOOTINGS OF COLUMN at plinth level using STEEL shutter 40.63 sft Edit
C-11 RAFT or MAT using STEEL shutter 12 sft Edit
C-12 FOUNDATION BEAM using STEEL shutter 80 sft Edit
C-13 PEDESTALS, COLUMN CAPITALS, LIFT WALLS and WALLS using STEEL shutter 40 sft Edit
C-14 TIE-BEAM, LINTEL using STEEL shutter 18.75 sft Edit
C-15 T-BEAM, L-BEAM, RECTANGULAR BEAM using STEEL shutter 80 sft Edit
C-16 FLOOR AND ROOF slab using STEEL shutter 350 sft Edit
C-17 CORNICE, DROP-WALLS, RAILING, LOUVER AND FINS etc. 62.5 sft Edit
C-18 SUNSHADE using STEEL shutter 34 sft Edit
C-19 STAIR CASE SLAB AND STEPS using STEEL shutter 70.5 sft Edit
C-20 WAFFEL or RIBED SLAB using STEEL shutter 311.41 sqm Edit
C-21 Arces, Domes, Vaults up to 8 m span 56.52 sqm Edit
C-22 Formwork cost for making fair-faced concrete surface 40 sft Edit