Schedule of Rates
Finance Division, Ministry of Finance
Search
Login
Home
Data
Long Schedule
Effective Date
Items Rate
Basic Item group
Basic Items
Division
Long Schedule
Break-up of Long Schedule
Add Break-up of Long Schedule
Basic Item
Break Down
Item Group
Test Schedule
FrameWork BreakUp (Add Breakup Item )
Secondary Input For RCC Works (Concrete, Formwork and Supports)
C-11 : RAFT or MAT using STEEL shutter
A : Labour, machinery, fuel and lubricant for casting CONCRETE using one concrete mixture machine
A-1 : Cost for placing 100 cft concrete using 1 mixer machine
A-2 : Cost for placing 100 cft concrete using 1 mixer machine
A-3 : Cost for placing 100 cft concrete using 1 mixer machine
A-4 : Cost for placing 100 cft concrete using 1 mixer machine
A-5 : Cost for placing 100 cft concrete using 1 mixer machine
B-1 : Concrete (1:3:6) work using BRICK CHIPS and sand of F.M. 1.2
B-2 : Concrete (1:2:4) work using BRICK CHIPS with sand of F.M. 1.2
B-3 : Concrete (1:2:4) work using BRICK CHIPS (sand of F.M. 1.2 and 2.2 in equal proportion)
B-4 : Concrete (1:2:4) work with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2
B-5 : Concrete (1:1.5:3) work with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2
B-6 : Concrete (1:1.25:2.5) work with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2
B-7 : Concrete (1:1:2) work with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2
B-8 : Fair-Face Concrete (1:1.5:3) work with CRUSHED STONE CHIPS, 75% grey cement, 25% white cement and 100% sand of F.M. 2.2
B-9 : Concrete (40 MPa) work with OPC (500kg/cum), CRUSHED STONE CHIPS and 100% sand of F.M. 2.2
B-10 : Concrete (25 MPa) work with PCC (400kg/cum), CRUSHED STONE CHIPS and 100% sand of F.M. 2.2
B-11 : Concrete (32 MPa) work with PCC (460kg/cum), CRUSHED STONE CHIPS and 100% sand of F.M. 2.2
B-12 : Concrete (1:1.25:2.5) work with PCC, CRUSHED STONE CHIPS and 100% sand of F.M. 2.2 for Saline Zone
C-1 : FOOTINGS OF COLUMN at plinth level using WOODEN shutter
C-2 : FOUNDATION BEAM using WOODEN shutter
C-3 : PADESTAL, COLUMN CAPITALS, LIFT WALLS and WALLS
C-4 : TIE-BEAM, LINTEL using WOODEN shutter
C-5 : T-BEAM, EL-BEAM, RECTANGULAR BEAM using WOODEN shutter
C-6 : FLOOR AND ROOF SLAB using WOODEN shutter
C-7 : CORNICE, DROP-WALLS, RAILINGS, LOUVER and FINS etc. using WOODEN shutter
C-8 : SUNSHADE using WOODEN shutter
C-9 : STAIR CASE SLAB and STEPS using WOODEN shutter
C-10 : FOOTINGS OF COLUMN at plinth level using STEEL shutter
C-12 : FOUNDATION BEAM using STEEL shutter
C-13 : PEDESTALS, COLUMN CAPITALS, LIFT WALLS and WALLS using STEEL shutter
C-14 : TIE-BEAM, LINTEL using STEEL shutter
C-15 : T-BEAM, L-BEAM, RECTANGULAR BEAM using STEEL shutter
C-16 : FLOOR AND ROOF slab using STEEL shutter
C-17 : CORNICE, DROP-WALLS, RAILING, LOUVER AND FINS etc.
C-18 : SUNSHADE using STEEL shutter
C-19 : STAIR CASE SLAB AND STEPS using STEEL shutter
C-20 : WAFFEL or RIBED SLAB using STEEL shutter
C-21 : Arces, Domes, Vaults up to 8 m span
C-22 : Formwork cost for making fair-faced concrete surface
Base Text
Base Quantity
Base Unit
Conversion Factor
C. Unit
Update RCC Work
Search Text
Search Item
Rate for Zone A
Zone B
Zone C
Zone D
Basic Item
Quantity
Unit
Item Rate
Item Unit
Extra Description
LumSum Amount
Multiplication Factor
Division Factor
Back to RCC Work
Per Unit Rate
Sub Total
Login
Email address
Password
Remember me
Login