Breakup

01.2.1 Providing 3 sets as-built drawings subject to Engineer’s approval produced in AutoCAD software in 584.5 mm x 413.5 mm (A-2 size) standard drawing paper, and operating and maintenance manual of the equipment and plant incorporated in the works, if any, in original by the date stated in the particular conditions of contract (PCC). If the contractor does not supply the as-built drawings and operating & maintenance manuals by the date stated in the particular conditions of contract (PCC), or they do not receive the Engineer-in-charge’s approval, the Engineer-in-charge shall withhold the amount stated in the PCC from the payments due to the contractor. The as-built drawings must show the permanent works as actually constructed and reflect the revision of drawings supplied to the contractor during the Contract as well as revisions of drawings supplied to the contractor during the contract. (One set of as-built drawings shall be considered for measurement and payment)

Considering per tender

SL Item Name Quantity Unit Item Rate (Taka) Item Unit Unit Price (Taka) Sub Total (Taka)
1 As built work survey & report 7 day 1800 per day 1800 12600
2 Skilled technician 3 day 1200 per day 1200 3600
3 Autocad operator 3 day 1200 per day 1200 3600
4 Providing expertised Architect 5years exp with registration in respective professional body 1 day 100000 per month 3333.33 3333.33
Sub-Total 23133.33
Contractor's Profit 10% 0.1 2313.33
Contractor's Overhead Expenses 3.5% 0.035 809.67
Total 26256.33
Add VAT with adjustment factor. 1.08108 7.5% 0.075 2128.89
Grand Total 28385.22
Rate per tender 28385
Rate per tender 28385