Considering:1 x 5'-0" x 7'-0"=35.00sft (finished)
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | Chattogram teak Chattogram Teak:((Frame Vertical4x1x7'-0''x0'-2.5''x0'-2.5''=1.22cft+Horizontal4x1x5'-0''x0'-2.5''x0'-2.5''=0.87cft+For middle partition 1x1x7'-0''x0'-1.5''x0'-1.5''=0.11cft+4x1x1'-8''x0'-2.5''x0'-2.5''=0.29cft+For Shelf 5x3x2'-6''x0'-1.5''x0'-1.5''=0.59cft+5x3x1'-8''x0'-1.5''x0'-1.5''=0.39cft+Front Shutter(Vertical)1x2x7'-0''x0'-1.25''x0'-1.25''=0.15cft+Front locker side 1x2x2'-6''x0'-2.5''x0'-2.5''=0.22cft+Shelf Batten wood 2x6x1'-8''x0'-1''x0'-1''=0.14cft)=3.98cft+Wastage5%=0.20cft)=4.18cft | 4.18 | cft | 4400 | per cft | 4400 | 18392 | |
| 2 | 18 mm thick Myanmar(Burma) Teak veneered board 18mm thick B.T Veneered Board Top 1 x 1 x 4'-7" x 1'-8" 7.64 sft Front 2 x 1 x 2'-6" x 6'-7" 32.92 sft Two Side 1 x 2 x 1'-8" x 6'-7" 21.94 sft For Shelf 7 x 1 x 1'-8" x 2'-6" 29.17 sft Middle Partition 1 x 1 x 1'-5" x 7'-0" 9.92 sft Middle Horizontal 1 x 1 x 2'-6" x 1'-8" 4.17 sft 105.76 sft Wastage 5% 5.29 sft 111.05 sft | 111.05 | sft | 110 | per sft | 110 | 12215.5 | |
| 3 | 18mm thick Garjan ply board 18mm thick Garjan ply board Back Side 1 x 5'-0" x 7'-0" 35.00 sft Wastage 5% 1.75 sft =36.75 sft | 36.75 | sft | 110 | per sft | 110 | 4042.5 | |
| 4 | S.S. Chain Hinge S.S Chain Hinge | 2 | nos | 250 | each | 250 | 500 | |
| 5 | 2" Magnet Magnet | 6 | nos | 45 | each | 45 | 270 | |
| 6 | SS Screws S.S Screws | 6.25 | dozen | 30 | per doz. | 30 | 187.5 | |
| 7 | Nails and wires 1.25'' nails slim | 0.5 | kg | 70 | per kg | 70 | 35 | |
| 8 | Metal Handle Metal Handle | 4 | nos | 210 | each | 210 | 840 | |
| 9 | Rubber gum Gum | 2 | kg | 655 | per kg | 655 | 1310 | |
| 10 | lock Lock | 3 | nos | 200 | each | 200 | 600 | |
| 11 | 25 mm dia stainless steel (2 mm thick) pipe-(grade A201) 25mm SS pipe 2mm thick 1 x 2'-6'' = 2.50rft | 2.5 | rft | 109 | per foot | 109 | 272.5 | |
| 12 | Carpenter Carpenter | 1.5 | nos | 700 | per day | 700 | 1050 | |
| 13 | Helper to carpenter/painter/plumber/rod binder/electrician/polish mistry/rig operator Carpenter Helper | 4.5 | nos | 550 | per day | 550 | 2475 | |
| 14 | Moulding for furniture work Moulding Bottom 1 x 2 x 5'-0" x 0'-3" 2.50 sft Side 1 x 2 x 7'-0" x 0'-2.5" 2.92 sft Side bottom 1 x 2 x 1'-8" x 0'-3" 0.83 sft Top 1 x 1 x 5'-0" x 0'-1" 0.42 sft =6.67 sft | 6.67 | sft | 851 | per sft | 851 | 5676.17 | |
| 15 | Carrying to site in/c sundries | LS | 700 | |||||
| Sub-Total | 48566.17 | |||||||
| Contractor's Profit | 10% | 0.1 | 4856.62 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 1699.82 | |||||
| Total | 55122.61 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 4469.4 | ||||
| Grand Total | 59592.01 | |||||||
| Rate per sft | 1702.63 | |||||||
| Rate per sqm | 18327.11 | |||||||