Breakup

19.10.2 for S.S. Grade A201

Considering 1 No. of gate Considering 10'-0" x 8'-0"= 80 sft in two parts

SL Item Name Quantity Unit Item Rate (Taka) Item Unit Unit Price (Taka) Sub Total (Taka)
1 50 mm x 50 mm x 1.5 mm SS box (grade A201) 50 mm x 50 mm x 1.5 mm ss box section as outer frame 4 x (8'-0"+ 5'-0")= 52.0 rft Add wastage 5%= 2.6 rft = 54.60 rft 54.6 rft 300 per foot 300 16380
2 38 mm x 38 mm, 1.5 mm thick SS box (grade A201) 37 mm x 37 mm x 1.5 mm ss box section as vertical section 14x2x8'-0= 224 rft Add wastage 5%= 11.2 rft = 235.20 rft 235.2 rft 180 per foot 180 42336
3 25 mm x 25 mm, 1.5mm thick SS square box (grade A201 ) 25mm x 25mm x 1.5 mm ss box section as horizontal section 2x5'-0"x2= 20.00 rft Add wastage 5%= 1.00 rft 21.00 rft 21 rft 115 per foot 115 2415
4 37 mm dia stainless steel (1.5 mm thick) pipe-(grade A201) 37mm x 1.5 mm ss round section = 9.00 rft Add wastage 5%= 0.45 rft = 9.45 rft 9.45 rft 138 per foot 138 1304.1
5 3 mm SS Channel 3 mm SS channel 20 rft 100 foot 100 2000
6 SS hollow round pipe 1.5mm thickness 25mm SS hollow round pipe 1.5mm thickness = 20.00 rft 6.10 rm 0.924 kg/rm = 5.6364 kg/rm 5.6364 kg/rm 300 per kg 300 1690.92
7 75 mm long brass hinges 6" Solid Hinges 6 nos 120 each 120 720
8 75mm dia SS Wheel SS Wheel 2 set 1800 each 1800 3600
9 75 mm - 150 mm M.S. clamp SS Locking clamp 8 nos 32 each 64 512
10 Hasp bolt Ø 25 x ↔ 254 mm 12" haspbolt Solid bar 2 nos 210 each 210 420
11 250 mm long SS tower bolt 10'' tower bolt 2 nos 150 each 150 300
12 Electrodes including electricity Electrodes 250 pc 10 each 10 2500
15 Welder Welder / fabricator 5 nos 700 per day 700 3500
16 Helper to carpenter/painter/plumber/rod binder/electrician/polish mistry/rig operator Helper/Ordinary labour 5 nos 550 per day 550 2750
18 Helper to carpenter/painter/plumber/rod binder/electrician/polish mistry/rig operator Making holes 6 nos 550 per day 22.92 137.52
19 Plain concrete (1:2:4) with brick chips Plain concrete: (1:2:4) 6 x 10" x 6" x 6"= 1.25 cft 16'-0" x 6" x 4"= 2.67 cft = 3.92 cft 3.92 cft 20151.67 % cft 201.52 789.96
20 Mason / Mosaic mistry Mason 1 no 700 per day 700 700
21 Helper to carpenter/painter/plumber/rod binder/electrician/polish mistry/rig operator Mason helper 1 no 550 per day 550 550
22 Ordinary labour Ordinary labour 1 no 550 per day 550 550
23 Workshop Charge 19.10.1 Workshop charge 1 - 103462.27 Unit 5173.11 5173.11
13 Polishing charge LS 500
14 SS Letter Writing LS 500
17 Carrying materials to work-shop & gate to site LS 550
Sub-Total 89878.61
Contractor's Profit 10% 0.1 8987.86
Contractor's Overhead Expenses 3.5% 0.035 3145.75
Total 102012.22
Add VAT with adjustment factor. 1.08108 7.5% 0.075 8271.25
Grand Total 110283.47
Rate per sft 1378.54
Rate per sqm 14838.6