Breakup

24.7.1 Brick on end edging (75 mm across the road) with first class or picked jhama bricks and filling the gaps with fine sand (F.M. 0.80) including cutting trenches, true to level and grade, removing earth, refilling and ramming the sides properly including cost of all materials and accepted by the Engineer-in-charge.

Considering 100 rft of work

SL Item Name Quantity Unit Item Rate (Taka) Item Unit Unit Price (Taka) Sub Total (Taka)
1 1st class/Picked jhama standard bricks Solid block of 240mmx114mmx70mm 250 nos 10000 per % 0 nos 10 2500
2 Sand (F.M. 0.8) Fine sand 2 cft 1670 per % cft 16.7 33.4
3 Head mason / Mosaic head mistry Head mason 0.05 no 800 per day 800 40
4 Mason / Mosaic mistry Mason 0.25 no 700 per day 700 175
5 Skilled labour Skilled labour 0.75 no 600 per day 600 450
6 Ordinary labour Local carriage, sundries, T & P 1 LS 550 per day 275 275
Sub-Total 3473.4
Contractor's Profit 10% 0.1 347.34
Contractor's Overhead Expenses 3.5% 0.035 121.57
Total 3942.31
Add VAT with adjustment factor. 1.08108 7.5% 0.075 319.65
Grand Total 4261.96
Rate per rft 42.62
Rate per rm 139.84