Breakup

25.14 Preparation of hedge beds by excavation of earth up to 300 mm depth, filling up the bed by a mixture of cow dung, loamy silty soil, cutted earth @ 1 cft cow dung manure per 6 cft of cutted earth and 20% loamy silty soil including supply of tools and plant etc. all complete and accepted by the Engineer-in-charge.

Considering 1 x 50`-0" x 1`-6" = 75 sft Hedge: 75 cft excavation

SL Item Name Quantity Unit Item Rate (Taka) Item Unit Unit Price (Taka) Sub Total (Taka)
Sub-Total 0
Contractor's Profit 10% 0.1 0
Contractor's Overhead Expenses 3.5% 0.035 0
Total 0
Add VAT with adjustment factor. 1.08108 7.5% 0.075 0
Grand Total 0
Rate per sft 0
Rate per sqm 0
Help