Breakup

25.16 Supply and carrying of 12.20 m long 100 mm dia borrak bamboo at site, loading and unloading at both end, stacking the same at site including supply of tools and plants etc. all complete and accepted by the Engineer-in-charge.

Considering 1 No. bamboo

SL Item Name Quantity Unit Item Rate (Taka) Item Unit Unit Price (Taka) Sub Total (Taka)
2 Borrak bamboo (full size) Cost of borrak bamboo 1 no 405 each 405 405
3 Ordinary labour Carrying in/c stacking 1 LS 550 per day 33 33
Sub-Total 438
Contractor's Profit 10% 0.1 43.8
Contractor's Overhead Expenses 3.5% 0.035 15.33
Total 497.13
Add VAT with adjustment factor. 1.08108 7.5% 0.075 40.31
Grand Total 537.44
Rate per each 537
Rate per each 537