25.17 Supply and carrying of 7.62 m long 50 mm to 62.5 mm dia muli bamboo at site, loading and unloading at both end, stacking the same at site including supply of tools and plants etc. all complete and accepted by the Engineer-in-charge.

Considering 1 No. bamboo.

SL Item Name Quantity Unit Item Rate (Taka) Item Unit Unit Price (Taka) Sub Total (Taka)
2 25'-0" long muli bamboo (full size) Cost of borrak bamboo 1 no 240 each 240 240
3 Ordinary labour Carrying in/c stacking 1 LS 550 per day 27.5 27.5
Sub-Total 267.5
Contractor's Profit 10% 0.1 26.75
Contractor's Overhead Expenses 3.5% 0.035 9.36
Total 303.61
Add VAT with adjustment factor. 1.08108 7.5% 0.075 24.62
Grand Total 328.23
Rate per each 328
Rate per each 328