Breakup

26.03.2 Approx. 570 X 375 mm size, minimum 22.00 kg of weight

Considering 1 no. of item

SL Item Name Quantity Unit Item Rate (Taka) Item Unit Unit Price (Taka) Sub Total (Taka)
1 Approx. 570 X 375 mm size, minimum 22.00 kg of weight Material cost: (A) Combi closet 1 no 23400 each 23400 23400
2 Portland Composite Cement ,(CEM-II/B-M 42.5N (42.5MPa) (6-20% constituents other than clinker): 50 kg bag Installation cost: (B) Fitting fixing materials:Cement mortar (1:4): Cement 0.1 bag 410 per bag 410 41
3 Sand (F.M. 1.2) Sand (F.M. 1.2) 0.5 cft 1900 per % cft 19 9.5
4 Nuts with washer Nuts with washer 4 nos 30 each 30 120
5 Plumber Labour: Plumber 0.25 no 700 per day 700 175
6 Skilled labour Skilled labour 0.5 no 600 per day 600 300
7 Ordinary labour Ordinary labour 0.5 no 550 per day 550 275
Sub-Total 24320.5
Contractor's Profit 10% 0.1 2432.05
Contractor's Overhead Expenses 3.5% 0.035 851.22
Total 27603.77
Add VAT with adjustment factor. 1.08108 7.5% 0.075 2238.14
Grand Total 29841.91
Rate per each 29842
Rate per each 29842
Help