Considering 1 no. of item
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 3 | Approx. 315 X 330 X 600 mm size, minimum 17.0 kg of weight. Material cost: (A) Urinal | 1 | no | 4700 | each | 4700 | 4700 | |
| 4 | Grating with brass coupling Installation cost: (B)Accessories and fitting fixing materials: Grating with brass coupling | 1 | no | 300 | each | 300 | 300 | |
| 5 | 32 mm dia PVC waste pipe for W-Basin connection 32 mm dia PVC waste pipe | 1 | no | 360 | each | 360 | 360 | |
| 6 | 75 mm Screw, Rowel plug & Washer 75 mm rowel plug | 2 | no | 14 | each | 14 | 28 | |
| 7 | Plumber Labour: Plumber | 0.15 | no | 700 | per day | 700 | 105 | |
| 8 | Skilled labour Skilled labour | 0.2 | no | 600 | per day | 600 | 120 | |
| 9 | Ordinary labour Ordinary labour | 0.4 | no | 550 | per day | 550 | 220 | |
| Sub-Total | 5833 | |||||||
| Contractor's Profit | 10% | 0.1 | 583.3 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 204.16 | |||||
| Total | 6620.46 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 536.79 | ||||
| Grand Total | 7157.25 | |||||||
| Rate per each | 7157 | |||||||
| Rate per each | 7157 | |||||||