Considering 1 no. of item
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 3 | Plastic low down complete Per set including internal fittings Material cost: (A) Plastic low down | 1 | no | 900 | each | 900 | 900 | |
| 4 | 32 mm dia PVC waste pipe for W-Basin connection Installation cost: (B) Fitting fixing materials: 32 mm dia plastic pipe | 1 | no | 360 | each | 360 | 360 | |
| 5 | CI brackets C.I. Bracket | 1 | pair | 150 | per pair | 150 | 150 | |
| 7 | PVC connection pipe PVC connection pipe | 1 | no | 45 | each | 45 | 45 | |
| 8 | Plumber Labour: Plumber | 0.25 | no | 700 | per day | 700 | 175 | |
| 9 | Skilled labour Skilled labour | 0.5 | no | 600 | per day | 600 | 300 | |
| 6 | Screw, rowel plug, washer, putty etc. | LS | 50 | |||||
| Sub-Total | 1980 | |||||||
| Contractor's Profit | 10% | 0.1 | 198 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 69.3 | |||||
| Total | 2247.3 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 182.21 | ||||
| Grand Total | 2429.51 | |||||||
| Rate per each | 2430 | |||||||
| Rate per each | 2430 | |||||||