Considering 1 no. of item
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | Flush Valve (foreign) Material cost: (A) flush valve for commode | 1 | no | 19500 | each | 19500 | 19500 | |
| 3 | Plumber Labour: Plumber | 0.2 | no | 700 | per day | 700 | 140 | |
| 4 | Skilled labour Skilled labour | 0.4 | no | 600 | per day | 600 | 240 | |
| 2 | Installation cost: (B) Fitting fixing materials:Screw, rowel plug, washer, putty etc. | LS | 75 | |||||
| Sub-Total | 19955 | |||||||
| Contractor's Profit | 10% | 0.1 | 1995.5 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 698.43 | |||||
| Total | 22648.93 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 1836.4 | ||||
| Grand Total | 24485.33 | |||||||
| Rate per each | 24485 | |||||||
| Rate per each | 24485 | |||||||