Breakup

26.51.1.9 HDPE pipe of 710 mm outside dia with wall thickness 27.2 mm - 30.1 mm

Considering 20 ft long HDPE one pipe

SL Item Name Quantity Unit Item Rate (Taka) Item Unit Unit Price (Taka) Sub Total (Taka)
1 710 mm dia HDPE pipe for under-ground 710 mm dia 20'-0" long pipe: 20 ft 8950 per foot 8950 179000
2 710 mm HDPE plain tee/T-Y for under-ground 710 mm HDPE Plain Tee/T-Y 0.25 no 60100 each 60100 15025
3 710 mm HDPE plain bend for under-ground 710 mm HDPE Plain Bend 0.5 no 51055 each 51055 25527.5
4 Butt fusion welding joint(630-1000 mm dia HDPE pipe) Jointing & fixing Materials Butt fusion welding joint 1 no 710 each 710 710
5 Earthwork in excavation Excavation (underground) 112.5 cft 4979.17 % 0 cft 49.79 5601.38
6 Sand (F.M. 1.2) Bedding by sand (FM 0.8) (underground) 77.5 cft 1900 per % cft 19 1472.5
7 Plumber Plumber 1 no 700 per day 700 700
8 Skilled labour Skilled labour 0.25 no 600 per day 600 150
9 Ordinary labour Ordinary labour 3 nos 550 per day 550 1650
Sub-Total 229836.38
Contractor's Profit 10% 0.1 22983.64
Contractor's Overhead Expenses 3.5% 0.035 8044.27
Total 260864.29
Add VAT with adjustment factor. 1.08108 7.5% 0.075 21151.14
Grand Total 282015.43
Rate per ft 14100.75
Rate per m 46264.56