Considering 20 ft long one pipe
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | 100 mm dia uPVC Pipe: 20 foot (6m) long 100 mm dia 20'-0" long pipe: | 20 | ft | 124 | per foot | 124 | 2480 | |
| 2 | 100 mm dia uPVC bend/offset Fittings: Bend/45O bend/off-set/cowel | 1 | no | 195 | each | 195 | 195 | |
| 3 | 100 mm dia uPVC Tee/T-Y/Y (50 x 50 mm) Tee/T-Y/Y | 1 | no | 230 | each | 230 | 230 | |
| 4 | Solvent cement Jointing & fixing materials : Solvent cement | 54 | ml | 0.85 | per ml | 0.85 | 45.9 | |
| 5 | Clamp Clamp | 4 | nos | 40 | each | 40 | 160 | |
| 6 | 50 mm screw & rowel plug Rowel plug & screw | 8 | nos | 9 | each | 9 | 72 | |
| 7 | Scaffolding Scaffolding | 20 | ft | 3.5 | per foot | 3.5 | 70 | |
| 8 | Plumber Labour: Plumber | 0.75 | no | 700 | per day | 700 | 525 | |
| 9 | Skilled labour Skilled labour | 1 | no | 600 | per day | 600 | 600 | |
| Sub-Total | 4377.9 | |||||||
| Contractor's Profit | 10% | 0.1 | 437.79 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 153.23 | |||||
| Total | 4968.92 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 402.89 | ||||
| Grand Total | 5371.81 | |||||||
| Rate per ft | 268.6 | |||||||
| Rate per meter | 881.28 | |||||||