Breakup

R.C.C pipe of 225 mm dia with thickness 40mm

Considering 1.83 m long 3 nos pipe = 5.49 m work

SL Item Name Quantity Unit Item Rate (Taka) Item Unit Unit Price (Taka) Sub Total (Taka)
1 225 mm dia RCC pipe (stone-chips, 40 mm thickness. 6'-0" long) 225 mm dia 1.83 m long RCC pipe: 3 nos 1825 each (6'-0") 1825 5475
2 Hem Hem 1.75 sqm 32 per sqm 32 56
3 Portland Composite Cement ,(CEM-II/B-M 42.5N (42.5MPa) (6-20% constituents other than clinker): 50 kg bag Cement 0.31 bag 410 per bag 410 127.1
4 Sand (F.M. 1.2) Sand (F.M. 1.2) 0.8 cft 1900 per % cft 19 15.2
5 Earthwork in excavation Excavation 137.73 cft 4979.17 % 0 cft 4.98 685.9
6 Sand (F.M. 1.2) Bedding by sand (F.M. 1.2) 18 cft 1900 per % cft 19 342
7 Plumber Plumber 0.5 no 700 per day 700 350
8 Skilled labour Skilled labour 0.5 no 600 per day 600 300
9 Ordinary labour Ordinary labour 1 no 550 per day 550 550
Sub-Total 7901.2
Contractor's Profit 10% 0.1 790.12
Contractor's Overhead Expenses 3.5% 0.035 276.54
Total 8967.86
Add VAT with adjustment factor. 1.08108 7.5% 0.075 727.12
Grand Total 9694.98
Rate per m 1765.94
Rate per m 1765.94