Considering 1 no. of item
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | Water purification capacity: 60 L/hr, at least 5 stage filtration RO purifier ; Material: (A) | 1 | no | 75000 | each | 75000 | 75000 | |
| 2 | Water purification capacity: 60 L/hr, at least 5 stage filtration RO purifier ; Installation charge excluding cost of pipe line (2 % of product cost) | 1 | no | 75000 | each | 1500 | 1500 | |
| 3 | Carriage, incidental, sundries etc. | LS | 500 | |||||
| Sub-Total | 77000 | |||||||
| Contractor's Profit | 10% | 0.1 | 7700 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 2695 | |||||
| Total | 87395 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 7086.07 | ||||
| Grand Total | 94481.07 | |||||||
| Rate per each | 94481 | |||||||
| Rate per each | 94481 | |||||||