for single 9" dia size RCC or 300 mm plastic/PVC pipes, Considering 1 No. pit
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | Earthwork in excavation Earth-work: 1 x 3-7" x 3'-7" x 3'-0"= 38.45 cft | 38.45 | cft | 4979.17 | % 0 cft | 4.98 | 191.48 | |
| 2 | One layer brick-flat soling Brick-flat soling: 1 x 3'-5" x 3'-5"= 11.7 sft | 11.7 | sft | 36.19 | % sft | 0.36 | 4.21 | |
| 3 | Plain concrete (1:3:6) with brick chips C.C. (1:3:6) on soling: 1 x 3'-5" x 3'-5" x 0'-3"= 2.92 cft | 2.92 | cft | 17561.67 | % cft | 175.62 | 512.81 | |
| 4 | Plain concrete (1:3:6) with brick chips C.C. (1:3:6) for invert: 1 x 1'-9" x 1'-9" x 0'-2"= 0.51 cft | 0.51 | cft | 17561.67 | % cft | 175.62 | 89.57 | |
| 5 | Brick work (1:6) in foundation Brick-work (1:6): 2 x (3'-5" + 1'-9") x 2'-6" x 0'-10"= 21.46 cft | 21.46 | cft | 17397.25 | % cft | 173.97 | 3733.4 | |
| 6 | 1/2 " thick plaster (1:4) with N.C.F. 12 mm plaster with n.c.f.: 4 x (1'-9" x 2'-6") + 1'-9" x 1'-9"= 20.56 sft | 20.56 | cft | 28.39 | sft | 0.28 | 5.76 | |
| 7 | Plumber Plumber | 0.125 | no | 700 | per day | 700 | 87.5 | |
| 8 | Skilled labour Skilled labour | 0.2 | no | 600 | per day | 600 | 120 | |
| 9 | Ordinary labour Ordinary labour | 0.235 | no | 550 | per day | 550 | 129.25 | |
| Sub-Total | 4873.98 | |||||||
| Contractor's Profit | 10% | 0.1 | 487.4 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 170.59 | |||||
| Total | 5531.97 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 448.54 | ||||
| Grand Total | 5980.51 | |||||||
| Rate per no | 5981 | |||||||
| Rate per each | 5981 | |||||||