Breakup

27.5.2 Furnishing design considering 2 Nos. test bores

Taking consideration of 2 nos test bore

SL Item Name Quantity Unit Item Rate (Taka) Item Unit Unit Price (Taka) Sub Total (Taka)
1 Field Engineer ( minimum BSc in Eng. with 3yrs exp OR Diploma in Eng. with 8yrs exp) Cost for furnishing design of tube-well considering 2 bore 1 LS 1900 per day 3377.78 3377.78
Sub-Total 3377.78
Contractor's Profit 10% 0.1 337.78
Contractor's Overhead Expenses 3.5% 0.035 118.22
Total 3833.78
Add VAT with adjustment factor. 1.08108 7.5% 0.075 310.85
Grand Total 4144.63
Rate per each 4145
Rate per each 4145