Cosidering 100 cft of work
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | 1st class/Picked jhama standard bricks Materials : Brick for chips: '@ 83 cft of chips per % cft of concrete & 8.5 Nos. of bricks per cft of chips. | 706 | nos | 10000 | per % 0 nos | 10 | 7060 | |
| 2 | Breaking of 20 mm down brick chips Breaking bricks in/c screening | 83 | cft | 970 | per % cft | 9.7 | 805.1 | |
| 3 | Sand (F.M. 2.2) Sand (F.M. 2.2) | 41.5 | cft | 5380 | per % cft | 53.8 | 2232.7 | |
| 4 | Ordinary Portland Cement, BDS-EN - 197-1-CEM-I ,52.5N (52.5MPa) / ASTM C-150 Type-I, 50 kg bag Cement: OPC, Type-1 (CEM-I),52.5 | 22 | bags | 440 | per bag | 440 | 9680 | |
| 5 | Ordinary labour Local carriage, sundries, T & P, water etc. | 1 | LS | 550 | per day | 550 | 550 | |
| Sub-Total | 20327.8 | |||||||
| Contractor's Profit | 10% | 0.1 | 2032.78 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 711.47 | |||||
| Total | 23072.05 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 1870.7 | ||||
| Grand Total | 24942.75 | |||||||
| Rate per cft | 249.43 | |||||||
| Rate per cum | 8808.62 | |||||||