Considering 1 meter
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | 50 mm dia Class E PVC pipe 50 mm dia (Class E) PVC pipe | 1 | meter | 233 | meter | 233 | 233 | |
| 2 | Ordinary labour Carriage of materials | 1 | LS | 550 | per day | 36.67 | 36.67 | |
| Sub-Total | 269.67 | |||||||
| Contractor's Profit | 10% | 0.1 | 26.97 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 9.44 | |||||
| Total | 306.08 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 24.82 | ||||
| Grand Total | 330.9 | |||||||
| Rate per meter | 331 | |||||||
| Rate per meter | 331 | |||||||