considering 1 no.
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | Disinfections of tube-well using bleaching powder (for 50 mm x 125 mm tube-well) Cost for disinfection of the tube well including supply of all the materials and other necessary cost as per specification (for 50 mm x 125 mm tube-well) | 1 | LS | 1340 | LS | 1340 | 1340 | |
| Sub-Total | 1340 | |||||||
| Contractor's Profit | 10% | 0.1 | 134 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 46.9 | |||||
| Total | 1520.9 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 123.32 | ||||
| Grand Total | 1644.22 | |||||||
| Rate per each | 1644 | |||||||
| Rate per each | 1644 | |||||||