Breakup

Filling of the bore-hole around the tube well from top of the shrouding up to the bottom of sanitary seal by withdrawn selected soil or local clay free from any substances harmful to pipes and health as per standard specification and accepted by the Engineer-in-charge.

Considering 100 meter

SL Item Name Quantity Unit Item Rate (Taka) Item Unit Unit Price (Taka) Sub Total (Taka)
1 Foreman/Supervisor Foreman 1 no 850 per day 850 850
2 Skilled labour Skilled labour 5 nos 600 per day 600 3000
3 Ordinary labour Local carriage, T & P 1 LS 550 per day 550 550
Sub-Total 4400
Contractor's Profit 10% 0.1 440
Contractor's Overhead Expenses 3.5% 0.035 154
Total 4994
Add VAT with adjustment factor. 1.08108 7.5% 0.075 404.92
Grand Total 5398.92
Rate per meter 53.99
Rate per meter 53.99