Considering 6.1 meter
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | 150 mm dia stainless steel strainer of continuous slot 150 mm dia stainless steel strainer | 6.1 | meter | 14600 | meter | 14600 | 89060 | |
| 2 | Grade 400/420(400Mpa / 400N/mm2 ≈ 60900psi/ 60 Grade), BDS-6935-2006, B400: and ratio fy to fu => 1.25 12 mm dia M.S. rod | 47.3 | lbs | 72000 | per M. ton | 32.65 | 1544.34 | |
| 3 | Ordinary labour Local carriage, welding & other necessary cost | 1 | LS | 550 | per day | 660 | 660 | |
| Sub-Total | 91264.34 | |||||||
| Contractor's Profit | 10% | 0.1 | 9126.43 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 3194.25 | |||||
| Total | 103585.02 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 8398.78 | ||||
| Grand Total | 111983.8 | |||||||
| Rate per meter | 18358.03 | |||||||
| Rate per meter | 18358.03 | |||||||