Considering 1 No.
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | 150 mm x 300 mm dia 6 mm thick M.S. reducer 150 x 300 mm dia M.S. reducer | 1 | no | 2420 | each | 2420 | 2420 | |
| 2 | Ordinary labour Carriage of materials | 1 | LS | 550 | per day | 275 | 275 | |
| Sub-Total | 2695 | |||||||
| Contractor's Profit | 10% | 0.1 | 269.5 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 94.33 | |||||
| Total | 3058.83 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 248.01 | ||||
| Grand Total | 3306.84 | |||||||
| Rate per each | 3307 | |||||||
| Rate per each | 3307 | |||||||