Considering 1 meter
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | 200 mm dia 6 mm thick G.I. pipe 200 mm dia 6 mm thick G.I. pipe | 1 | meter | 6200 | meter | 6200 | 6200 | |
| 2 | Ordinary labour Carriage of materials | 1 | LS | 550 | per day | 137.5 | 137.5 | |
| Sub-Total | 6337.5 | |||||||
| Contractor's Profit | 10% | 0.1 | 633.75 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 221.81 | |||||
| Total | 7193.06 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 583.22 | ||||
| Grand Total | 7776.28 | |||||||
| Rate per meter | 7776 | |||||||
| Rate per meter | 7776 | |||||||