Considering 1 No.
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | 50 mm dia C-Class water- grade pipe Best quality 450 mm dia 6 mm thick M.S. cap. | 1 | no | 90 | foot | 90 | 90 | |
| 2 | Ordinary labour Carriage, welding, fabrication and other necessary cost etc. | 1 | LS | 550 | per day | 550 | 550 | |
| Sub-Total | 640 | |||||||
| Contractor's Profit | 10% | 0.1 | 64 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 22.4 | |||||
| Total | 726.4 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 58.9 | ||||
| Grand Total | 785.3 | |||||||
| Rate per each | 785 | |||||||
| Rate per each | 785 | |||||||