considering no. 1
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | Complete development of the tube-well up to 200 m depth (50 mm x 150 mm tube-well). Development of tube well for depth up to 200 m. | 1 | LS | 25500 | LS | 25500 | 25500 | |
| Sub-Total | 25500 | |||||||
| Contractor's Profit | 10% | 0.1 | 2550 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 892.5 | |||||
| Total | 28942.5 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 2346.69 | ||||
| Grand Total | 31289.19 | |||||||
| Rate per each | 31289 | |||||||
| Rate per each | 31289 | |||||||