Considering 0 m to 50 m
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | 350 mm dia boring: up to 50 m depth. Cost for boring including all equipment, accessories, labours and materials along with insurance coverage of risks | 50 | meter | 850 | meter | 850 | 42500 | |
| Sub-Total | 42500 | |||||||
| Contractor's Profit | 10% | 0.1 | 4250 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 1487.5 | |||||
| Total | 48237.5 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 3911.14 | ||||
| Grand Total | 52148.64 | |||||||
| Rate per meter | 1042.98 | |||||||
| Rate per meter | 1042.98 | |||||||