considering no. 1
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | Disinfections of tube-well using bleaching powder (for 50 mm x 125 mm tube-well) Cost for disinfection of the tube well including supply of all the materials and other necessary cost as per specification | 1 | LS | 1340 | LS | 1627.14 | 1627.14 | |
| Sub-Total | 1627.14 | |||||||
| Contractor's Profit | 10% | 0.1 | 162.71 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 56.95 | |||||
| Total | 1846.8 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 149.74 | ||||
| Grand Total | 1996.54 | |||||||
| Rate per each | 1997 | |||||||
| Rate per each | 1997 | |||||||