Considering 1 meter
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | 200 mm dia and 6 mm thick M.S. pipe seamless 200 mm dia 6 mm thick M.S. housing pipe | 1 | meter | 4010 | meter | 4010 | 4010 | |
| 2 | Ordinary labour Carriage of materials | 1 | LS | 550 | per day | 275 | 275 | |
| Sub-Total | 4285 | |||||||
| Contractor's Profit | 10% | 0.1 | 428.5 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 149.98 | |||||
| Total | 4863.48 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 394.34 | ||||
| Grand Total | 5257.82 | |||||||
| Rate per meter | 5258 | |||||||
| Rate per meter | 5258 | |||||||