Considering 1 No.
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | 6 mm thick 200 mm dia M.S. Cap 200 mm dia 6 mm thick M.S. cap. | 1 | no | 1560 | each | 1560 | 1560 | |
| 2 | Mason / Mosaic mistry Carriage, welding, fabrication and other necessary cost | 1 | LS | 700 | per day | 700 | 700 | |
| Sub-Total | 2260 | |||||||
| Contractor's Profit | 10% | 0.1 | 226 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 79.1 | |||||
| Total | 2565.1 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 207.98 | ||||
| Grand Total | 2773.08 | |||||||
| Rate per each | 2773 | |||||||
| Rate per each | 2773 | |||||||