Beyond 60 m depth Considering 1 rft
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | 40 mm dia "D" grade pipe Cost of 40 mm dia uPVC pipe | 1 | rft | 40 | foot | 40 | 40 | |
| 2 | Ordinary labour Labour cost for sinking and other costs | 1 | LS | 550 | per day | 82.5 | 82.5 | |
| Sub-Total | 122.5 | |||||||
| Contractor's Profit | 10% | 0.1 | 12.25 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 4.29 | |||||
| Total | 139.04 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 11.27 | ||||
| Grand Total | 150.31 | |||||||
| Rate per meter | 2.5 | |||||||
| Rate per meter | 2.5 | |||||||