Considering 1.40 m x 1.00 m size platform and 1 m long drain
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | Earthwork in excavation Earth cutting | 0.67 | cum | 4979.17 | % 0 cft | 175.84 | 117.81 | |
| 2 | Sand fill (0.8) Sand filling | 0.26 | cum | 2692.67 | % cft | 950.92 | 247.24 | |
| 3 | Brick work (1:6) in foundation Brick work (1:6) | 0.29 | cum | 17397.25 | % cft | 6143.84 | 1781.71 | |
| 4 | Plain concrete (1:2:4) with brick chips C.C. (1:2:4) | 0.24 | cum | 20151.67 | % cft | 7116.56 | 1707.97 | |
| 5 | 1/2 " thick plaster (1:4) with N.C.F. 12 mm plaster (1:4) in/c n.c.f. | 2 | sqm | 28.39 | sft | 305.59 | 611.18 | |
| 6 | Earthwork in excavation Earth cutting | 0.06 | cum | 4979.17 | % 0 cft | 175.84 | 10.55 | |
| 7 | Brick work (1:6) in foundation Brick work (1:6) | 0.06 | cum | 17397.25 | % cft | 6143.84 | 368.63 | |
| 8 | 1/2 " thick plaster (1:4) with N.C.F. 12 mm plaster (1:4) in/c n.c.f. | 0.7 | sqm | 28.39 | sft | 305.59 | 213.91 | |
| Sub-Total | 5059 | |||||||
| Contractor's Profit | 10% | 0.1 | 505.9 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 177.07 | |||||
| Total | 5741.97 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 465.56 | ||||
| Grand Total | 6207.53 | |||||||
| Rate per no | 6208 | |||||||
| Rate per each | 6208 | |||||||