Considering 1 No. pump
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | EPI / RFL (medium) brand no 6 Pump with necessary fittings etc. Materials: No. 6 pump with nut and bolts | 1 | no | 3000 | each | 3000 | 3000 | |
| 2 | 50 mm dia GI pipe 50 mm dia G.I. pipe | 2 | rft | 250 | per foot | 250 | 500 | |
| 3 | 50 mm x 40 mm socket (reducer) 50 x 40 mm socket (reducer) | 1 | no | 80 | each | 80 | 80 | |
| 4 | 4'-0" long cylinder 4'-0" long cylinder | 1 | no | 205 | each | 205 | 205 | |
| 5 | 40 mm dia pipe nipple 40 mm dia nipple | 1 | no | 123 | each | 123 | 123 | |
| 6 | Grade 400/420(400Mpa / 400N/mm2 ≈ 60900psi/ 60 Grade), BDS-6935-2006, B400: and ratio fy to fu => 1.25 3/8" dia M.S. rod | 18.81 | lbs | 72000 | per M. ton | 32.65 | 614.15 | |
| 7 | Tie foot ball Tie foot ball | 1 | no | 40 | Pair | 40 | 40 | |
| 8 | Tie plunger Tie planger | 1 | pair | 80 | each | 80 | 80 | |
| 9 | 3/8" dia socket 3/8" dia socket | 3 | nos | 20 | each | 20 | 60 | |
| 10 | 3/8" dia nut 3/8" dia nut | 4 | nos | 18 | each | 18 | 72 | |
| 11 | Solution big size Solution (big size) | 1 | no | 500 | each | 500 | 500 | |
| 12 | Tape Tape | 2 | nos | 24 | each | 24 | 48 | |
| 13 | Ordinary labour Workshop charge for cutting M.S. rod in suitable size threaded and necessary welding | 1 | LS | 550 | per day | 1100 | 1100 | |
| 14 | Plumber Labour cost : Plumber | 1 | no | 700 | per day | 700 | 700 | |
| 15 | Skilled labour Skilled labour | 1 | no | 600 | per day | 600 | 600 | |
| Sub-Total | 7722.15 | |||||||
| Contractor's Profit | 10% | 0.1 | 772.22 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 270.28 | |||||
| Total | 8764.65 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 710.65 | ||||
| Grand Total | 9475.3 | |||||||
| Rate per each | 9475 | |||||||
| Rate per each | 9475 | |||||||