Breakup

28.9.1 12 mm x 6 mm N.D.

Considering 1 No.

SL Item Name Quantity Unit Item Rate (Taka) Item Unit Unit Price (Taka) Sub Total (Taka)
1 12 x 6 mm gas stop cock Heavy type gas stop cock 1 no 275 each 275 275
2 Ordinary labour Labour: 1 LS 550 per day 27.5 27.5
Sub-Total 302.5
Contractor's Profit 10% 0.1 30.25
Contractor's Overhead Expenses 3.5% 0.035 10.59
Total 343.34
Add VAT with adjustment factor. 1.08108 7.5% 0.075 27.84
Grand Total 371.18
Rate per each 371
Rate per each 371