Breakup

31.4 Added cost per bore hole, if the same is under water by more than 1.5 m in depth

Considering 1 point

SL Item Name Quantity Unit Item Rate (Taka) Item Unit Unit Price (Taka) Sub Total (Taka)
1 Foreman including site allowances Man-power : Foreman (1 x 1/16) 0.06 manday 910 per day 910 54.6
2 Rig operators including site allowances Rig operators (1 x 1/8) 0.13 manday 750 per day 750 97.5
3 Skilled labour Skilled labour (6 x 1/8) 0.38 manday 600 per day 600 228
4 Ordinary labour Unskilled labour (2 x 1/8) 0.25 manday 550 per day 550 137.5
5 Bamboo Material : Bamboo for platform (using 6 times) 268 rft 13.5 per foot 2.25 603
6 Wooden plank (mango) Wooden plank (using 6times) 10 x 8'-0" x 12" x 1.5"=12 cft 12 cft 700 per cft 116.67 1400.04
7 Rope Rope (using 4 times) 8 kg 55 per kg 13.75 110
8 Small boat Hire charge of small boat 1 no 850 per day 850 850
9 Skilled technician Boatman & helper 1 no 1200 per day 1200 1200
10 Ordinary labour Tools & plant, sundries, consumables, local carrying 1 LS 550 per day 2200 2200
Sub-Total 6880.64
Contractor's Profit 10% 0.1 688.06
Contractor's Overhead Expenses 3.5% 0.035 240.82
Total 7809.52
Add VAT with adjustment factor. 1.08108 7.5% 0.075 633.2
Grand Total 8442.72
Rate per bore hole 8443
Rate per bore hole 8443