Considering 1 No.
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | Grade 300(300Mpa / 300N/mm2 ≈ 43500psi/40 Grade): BDS- 6935-2006 - B300 and Ratio fy to fu =>1.25 Cost of 3/8" dia M.S. rod | 1 | LS | 65000 | per M. ton | 16.06 | 16.06 | |
| 2 | Rod binder Fabrication | 1 | LS | 700 | per day | 16.63 | 16.63 | |
| 3 | Grade 300(300Mpa / 300N/mm2 ≈ 43500psi/40 Grade): BDS- 6935-2006 - B300 and Ratio fy to fu =>1.25 Nuts, washer | 1 | LS | 65000 | per M. ton | 8.03 | 8.03 | |
| Sub-Total | 40.72 | |||||||
| Contractor's Profit | 10% | 0.1 | 4.07 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 1.43 | |||||
| Total | 46.22 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 3.75 | ||||
| Grand Total | 49.97 | |||||||
| Rate per each | 50 | |||||||
| Rate per each | 50 | |||||||