Considering 1 No.
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | Grade 300(300Mpa / 300N/mm2 ≈ 43500psi/40 Grade): BDS- 6935-2006 - B300 and Ratio fy to fu =>1.25 Cost of 3/8" dia M.S. rod | 1 | LS | 65000 | per M. ton | 22.09 | 22.09 | |
| 2 | Rod binder Fabrication | 1 | LS | 700 | per day | 17.5 | 17.5 | |
| 3 | Grade 300(300Mpa / 300N/mm2 ≈ 43500psi/40 Grade): BDS- 6935-2006 - B300 and Ratio fy to fu =>1.25 Nuts, washer | 1 | LS | 65000 | per M. ton | 12.91 | 12.91 | |
| Sub-Total | 52.5 | |||||||
| Contractor's Profit | 10% | 0.1 | 5.25 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 1.8399999999999999 | |||||
| Total | 59.59 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 4.83 | ||||
| Grand Total | 64.42 | |||||||
| Rate per each | 64 | |||||||
| Rate per each | 64 | |||||||