Considering 1 No. clamp
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | 150 long clamp: Iron 150 mm long clamp | 1 | no | 13 | each | 13 | 13 | |
| 2 | Plain concrete (1:2:4) with brick chips C.C. (1:2:4) with brick-chips Item No. 3.5.2 | 0.0028 | cum | 20151.67 | % cft | 7109.51 | 19.91 | |
| 3 | Ordinary labour Labour charge | 1 | LS | 550 | per day | 27.5 | 27.5 | |
| Sub-Total | 60.41 | |||||||
| Contractor's Profit | 10% | 0.1 | 6.04 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 2.11 | |||||
| Total | 68.56 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 5.5600000000000005 | ||||
| Grand Total | 74.12 | |||||||
| Rate per each | 74 | |||||||
| Rate per each | 74 | |||||||