Breakup

32.80.2 60-grade deform bar

Considering use of 1 kg 40-grade deform bar

SL Item Name Quantity Unit Item Rate (Taka) Item Unit Unit Price (Taka) Sub Total (Taka)
1 Grade 400/420(400Mpa / 400N/mm2 ≈ 60900psi/ 60 Grade), BDS-6935-2006, B400: and ratio fy to fu => 1.25 Cost of materials 1 kg 72000 per M. ton 72 72
Sub-Total 72
Contractor's Profit 10% 0.1 7.2
Contractor's Overhead Expenses 3.5% 0.035 2.52
Total 81.72
Add VAT with adjustment factor. 1.08108 7.5% 0.075 6.63
Grand Total 88.35
Rate per kg 88
Rate per kg 88