For each construction site
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | Waste bin made of plastic material Cost of materials : a) Bins (Plastic material) | 3 | nos | 1250 | each | 1250 | 3750 | |
| 2 | Polythine Bag etc | LS | 500 | |||||
| Sub-Total | 4250 | |||||||
| Contractor's Profit | 10% | 0.1 | 425 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 148.75 | |||||
| Total | 4823.75 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 391.11 | ||||
| Grand Total | 5214.86 | |||||||
| Rate per site | 5215 | |||||||
| Rate per site | 5215 | |||||||