Breakup

09.11 Cost of bed preparation including one layer brick flat soling with first class/picked jhama bricks including preparation of bed and filling the interstices with local sand, leveling etc. complete and accepted by the Engineer-in-charge, Minimum 12 mm thick cement sand (F.M. 1.2) plaster with neat cement finishing with cement (1:4) including washing of sand, finishing the edges and corners and curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect and accepted by the Engineer-in-charge (Cement: CEM-II/B-M) and polythene as separator between pile layers during casting concrete

Considering 1 sft

SL Item Name Quantity Unit Item Rate (Taka) Item Unit Unit Price (Taka) Sub Total (Taka)
1 One layer brick-flat soling One layer brick flat soling: 1 sft 36.19 % sft 0.36 0.36
2 1/2 " thick plaster (1:4) with N.C.F. 1/2" thick cement finishing with neat cement finishing 1 sft 28.39 sft 28.39 28.39
Sub-Total 28.75
Contractor's Profit 10% 0.1 2.88
Contractor's Overhead Expenses 3.5% 0.035 1.01
Total 32.64
Add VAT with adjustment factor. 1.08108 7.5% 0.075 2.65
Grand Total 35.29
Rate per sft 35
Rate per sqm 376.74