Considering 1000 Kg of work
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | U-shape hot rolled steel sheet pile U-shape hot rolled steel sheet pile | 1000 | kg | 95000 | per M.Ton | 95 | 95000 | |
| 2 | Truck fare within 20 km including loading & un-loading Cost of transportation (i) Transportation/ carriage i/c load-unloading | 1000 | kg | 1850 | per trip | 1.85 | 1850 | |
| Sub-Total | 96850 | |||||||
| Contractor's Profit | 10% | 0.1 | 9685 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 3389.75 | |||||
| Total | 109924.75 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 8912.81 | ||||
| Grand Total | 118837.56 | |||||||
| Rate per kg | 118.84 | |||||||
| Rate per per kg | 118.84 | |||||||