Breakup

02.5 Palisading work by supplying of bitumen drum sheet walling tied with 20 BWG G.I. wire fixing the same with already driven borrak bamboo posts with half split borrak bamboo runners @ 450mm c/c horizontally with iron nails, G.I wire etc. all complete and accepted by the Engineer-in-charge. (Rate is excluding the cost of bamboo post).

Palisading work with drum sheet excluding cost of vertical post Considering 30'-0" x 5'-0"= 150 sft of work

SL Item Name Quantity Unit Item Rate (Taka) Item Unit Unit Price (Taka) Sub Total (Taka)
1 Bamboo Half split borrak bamboo runner @ maximum 1'-6" c/c horizontally, minimum 4 nos 0.50 x 4.00 x 30.00= 60 rft 13.5 per foot 13.5 810
2 Used and empty Bitumen drum Bitumen drum sheet: '@ 3.14 x 2 x 3'=18.84 sft per drum 12 nos 250 each 250 3000
3 Nails and wires Nails, gozzal & wire etc. 5 kg 70 per kg 70 350
4 Skilled labour Labour for cutting and straightening drum sheet, placing and fixing the same with bamboo post and runner etc. complete. Skilled labour 1 nos 600 per day 600 600
5 Ordinary labour Labour for cutting and straightening drum sheet, placing and fixing the same with bamboo post and runner etc. complete. Ordinary labour 2 nos 550 per day 550 1100
6 Ordinary labour Local carriage 2 LS 550 per day 550 1100
Sub-Total 6960
Contractor's Profit 10% 0.1 696
Contractor's Overhead Expenses 3.5% 0.035 243.6
Total 7899.6
Add VAT with adjustment factor. 1.08108 7.5% 0.075 640.51
Grand Total 8540.11
Rate per sft 56.93
Rate per per sqm 612.79