For 1 No. shutter Considering 6'-9" x 3'-0"= 20.25 sft (single leaf) For Myanmar(Burma) Teak
| SL | Item Name | Quantity | Unit | Item Rate (Taka) | Item Unit | Unit Price (Taka) | Sub Total (Taka) | |
|---|---|---|---|---|---|---|---|---|
| 1 | 250 mm long brass tower bolt Fittings: 250mm long brass tower bolt | 1 | no | 400 | each | 400 | 400 | |
| 2 | 200 mm long brass socket bolt 200mm long brass socket bolt | 1 | no | 300 | each | 300 | 300 | |
| 3 | 100 mm longs brass hinge 100mm long brass hinges | 4 | no | 150 | each | 150 | 600 | |
| 4 | 150 mm Brass handle Brass Handle | 2 | no | 100 | each | 100 | 200 | |
| 5 | Brass screw/38 mm screw Brass Screws | 5 | dzn | 25 | per doz. | 25 | 125 | |
| 6 | Hinged cleats and buffer block Hinged cleats & buffer block | 1 | set | 62 | set | 62 | 62 | |
| 7 | Carpenter Labour: Carpenter | 2 | nos | 700 | per day | 700 | 1400 | |
| 8 | Helper to carpenter/painter/plumber/rod binder/electrician/polish mistry/rig operator Carpenter helper | 4 | nos | 550 | per day | 550 | 2200 | |
| 9 | Myanmar(Burma) teak Cost of wood: Myanmar(Burma) Teak : (Stile 2x7'x4''x1.75''=0.681cft + Top Rail 3'x5''x1.75''=0.182cft + Bottom Rail 3'x9''x1.75''=0.328cft + Lock Rail 30''x5''x1.75'' =0.152cft + Upper & Bottom Part 2x4x8''x32''x1.75'' =2.074cft)=3.417cft | 3.417 | cft | 7100 | per cft | 7100 | 24260.7 | |
| 10 | Seasoning of timber in plant Seasoning of timber : Seasoning charge | 3.417 | cft | 165 | per cft | 165 | 563.8 | |
| 11 | Ordinary labour Labour for loading, unloading and carriage of timber at both ends (1 x 2) | 6.834 | cft | 550 | per day | 55 | 375.87 | |
| Sub-Total | 30487.37 | |||||||
| Contractor's Profit | 10% | 0.1 | 3048.74 | |||||
| Contractor's Overhead Expenses | 3.5% | 0.035 | 1067.06 | |||||
| Total | 34603.17 | |||||||
| Add VAT with adjustment factor. | 1.08108 | 7.5% | 0.075 | 2805.66 | ||||
| Grand Total | 37408.83 | |||||||
| Rate per sft | 1847.36 | |||||||
| Rate per sqm | 19884.98 | |||||||