Breakup

12.21.1 With SS Fittings

Considering 3'-0" x 2'-6" = 7.50 sft

SL Item Name Quantity Unit Item Rate (Taka) Item Unit Unit Price (Taka) Sub Total (Taka)
1 Chattogram teak (a)Material cost:(i) Cost of ctg. Wood:(Outer frame=2x3'-0"x3.25"x1.75"=0.24cft+2x2'-6"x3.25"x1.75"=0.20cft+Horizontal blade:17x2'-6"x3"x1"=1.06cft)=1.50cft 1.5 cft 4400 per cft 4400 6600
2 75 mm longs SS hinge (ii) SS hinges 2 nos 70 each 70 140
3 SS Screws (iii)SS Screws 36 nos 30 per doz. 2.5 90
4 100 mm SS handle (iv) 100mm SS handle 1 nos 100 each 100 100
5 Magnetic catch (v) Magnetic catch 2 nos 50 each 50 100
6 Carpenter (b) Labour cost for making moulding : (i) Carpenter 1.5 nos 700 per day 700 1050
7 Helper to carpenter/painter/plumber/rod binder/electrician/polish mistry/rig operator (ii) Helper 1.5 nos 550 per day 550 825
8 Carpenter (c) Labour cost for fitting & fixing: (i) Carpenter 0.1 nos 700 per day 700 70
9 Helper to carpenter/painter/plumber/rod binder/electrician/polish mistry/rig operator (ii) Helper 0.1 nos 550 per day 550 55
10 Seasoning of timber in plant (d) Seasoning of timber : Seasoning charge: 1.5 cft 165 per cft 165 247.5
11 Ordinary labour Labour for loading, unloading and carriage of timber at both ends (1 x 2) 3 cft 550 per day 55 165
Sub-Total 9442.5
Contractor's Profit 10% 0.1 944.25
Contractor's Overhead Expenses 3.5% 0.035 330.49
Total 10717.24
Add VAT with adjustment factor. 1.08108 7.5% 0.075 868.96
Grand Total 11586.2
Rate per sft 1544.8
Rate per sqm 16628.23