Breakup

15.9 Raised or tack pointing work to brick wall with cement sand (F.M. 1.2) mortar (1:2) with fresh cement of minimum 12 mm x 20 mm in size including raking out the joints and necessary scaffolding, curing at least for 7 days, cleaning each and every brick, cutting the bricks with pumice stone where necessary etc. all complete in all floors, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) ground floor.

Considering 100 sft of work

SL Item Name Quantity Unit Item Rate (Taka) Item Unit Unit Price (Taka) Sub Total (Taka)
1 Sand (F.M. 1.2) Sand (F.M. 1.2) 3 cft 1900 per % cft 19 57
2 Portland Composite Cement ,(CEM-II/B-M 42.5N (42.5MPa) (6-20% constituents other than clinker): 50 kg bag Cement 1 bag 410 per bag 410 410
3 Pumice stone for finishing mosaic work Cost of pumice stone 0.25 no 175 each 175 43.75
4 Head mason / Mosaic head mistry Labour : Head mason 0.5 no 800 per day 800 400
5 Mason / Mosaic mistry Mason 2 nos 700 per day 700 1400
6 Skilled labour Skilled labour 2 nos 600 per day 600 1200
7 Ordinary labour Ordinary labour 2 nos 550 per day 550 1100
8 Ordinary labour Washing of sand, scaffolding, curing, sundries, local carriage etc. 1 LS 550 per day 244.44 244.44
Sub-Total 4855.19
Contractor's Profit 10% 0.1 485.52
Contractor's Overhead Expenses 3.5% 0.035 169.93
Total 5510.64
Add VAT with adjustment factor. 1.08108 7.5% 0.075 446.81
Grand Total 5957.45
Rate per sft 59.57
Rate per sqm 641.21