96.MISCELLENEOUS ITEMS
2016-Arc welding at workshop / factory per foot 27 27 25.7 25.7 Edit
2017-Cutting by oxy-ace of 12 mm M.S plate, top & bott plate per foot 37 37 36 36 Edit
2018-12 mm MS Plate Grinding to V bevel top & bott per foot 52.5 52.5 51 51 Edit
2019-25 mm dia Hole in 12 mm M.S plate per nos 52.5 52.5 51 51 Edit
2020-Cutting by shearing granding and hole for steel jacket, 6 mm plate on 2U x ( top & bott) - C or U form per foot 15 15 15 15 Edit
2021-6 mm MS Plate Grinding to V bevel on faces of U legs for top & bott per foot 80 80 80 80 Edit
2022-Charge to bend 6 mm MS Plates per foot 34 34 37.5 37.5 Edit
2023-50 mm dia Hole in 6 mm M.S plate p/nos 125 125 125 125 Edit
2024-38 mm G.I / MS pipe for dowel bar per foot 215 215 225 215 Edit
2025-Fabrication: bending of 20mm bar in U per Mton 6700 6700 6700 6700 Edit