List of Basic Item

Create New Item



Item Code and Name Unit Rate for Zone-A
Dhaka & Mymensingh Division
Rate for Zone-B
Chattogram & Sylhet Division
Rate for Zone-C
Rajshahi & Rangpur Division
Rate for Zone-D
Khulna & Barishal Division
3.EQUIPMENT, TOOLS & PLANTS, VEHICLE, SCAFFOLDING ETC.
41-Carriage of earth by any means for site development in in all district except Dhaka, Chattogram, and Narayangonj city cft 7.5 7.5 7.5 7.5 Edit
42-5-ton capacity truck-fare including loading & unloading (within 30 km radius) per trip 2300 2300 2100 2100 Edit
43-Hire charge of concrete mixer machine per day 1200 1200 1200 1200 Edit
44-Hire charge of concrete vibrator per day 550 540 500 500 Edit
45-Hire charge of water pump for concreting or similar purposes per day 530 530 530 530 Edit
46-Hire charge of diesel operated 1/4 cusec capacity water pump per day 640 640 640 640 Edit
47-Hire charge of electricity operated 1 cusec capacity water pump per day 850 850 850 850 Edit
48-Hire charge of 1 cusec capacity diesel operated water pump per day 1300 1300 1300 1300 Edit
49-Fuel & lubricant for mixer machine, vibrator, pump etc. per day 1275 1275 1275 1275 Edit
50-Hire charge of mosaic cutting machine per day 550 550 550 550 Edit

Help